00DATUM

BUILD-TO-PRINT / SMALL DIAMETER

SMALL PARTS.CRITICAL FITS.

Check fit + prepare RFQ
Illustrative stepped shaft geometry BEARING FITDATUM RELATIONSECONDARY FEATURE
ILLUSTRATIVE / DATUM STUDYNot a customer drawing or capability claim.
01PART FOCUSSHAFTS / PINS / BUSHINGS
02REVIEW GATESTEP + CONTROLLED 2D
03UAV SCOPECIVIL / COMMERCIAL ONLY
02PROCESS FIT

QUALIFICATION FIRST

A PROCESS FIT IS NOT A PROMISE.

LIKELY FIT
  • Small-diameter rotational body
  • Steps, grooves, threads or cross-holes
  • Controlled fits and repeat batches
ROUTE REVIEW
  • Hardening followed by grinding
  • Gears, splines or assembly scope
  • Large structures or catalog parts
Run the part-fit check
03APPLICATION

PRIMARY MARKET

MOTION,
LOCATED.

Small turned components for motors, compact gearheads, actuators and repeatable positioning systems.

MOTORGEARHEADACTUATORFIXTURE
Robotics + automation →
CIVIL + COMMERCIAL / SCREENED

UAV + GIMBAL

End user, end use and destination are reviewed before quotation.

Review requirements →
Illustrative bushing geometry BEARING FITDATUM RELATIONSECONDARY FEATURE
ILLUSTRATIVE / DATUM STUDYNot a customer drawing or capability claim.
04EVIDENCE

TRUST SYSTEM

SHOW THE RECORD.

Capability is specific to the drawing, route, inspection method and approved manufacturing source.

E-01DRAWING CONTROL

Controlled revision / conflict resolution

PROCESS DEFINED
E-02INSPECTION PLAN

CTQ / method / agreed record

AGREED PER RFQ
E-03FILE HANDLING

Private intake / restricted access

PRODUCTION GATE

DOCUMENTATION IS DEFINED PER QUOTATION / NO BLANKET CERTIFICATION CLAIMS

05WORKFLOW

CONTROLLED PATH

INPUT BEFORE OUTPUT.

  1. 01 / INPUTBuyer

    STEP + 2D + material + quantity + end use

    CNCX

    Completeness gate

  2. 02 / REVIEWBuyer

    Clarifies functional risks

    CNCX

    Fit and route review

  3. 03 / ROUTEBuyer

    Confirms requirements

    CNCX

    Quotation and timing

  4. 04 / QUALIFYBuyer

    Approves evidence

    CNCX

    Sample coordination

  5. 05 / REPEATBuyer

    Controls revisions

    CNCX

    Batch and delivery record

06RFQ GATE

START HERE

QUALIFY THE PROJECT BEFORE FILE EXCHANGE.

Screen part fit and prepare non-confidential requirements first. Controlled drawings are exchanged only through an approved route.

Open the preparation gate
013D MODELSTEP / IGES
02CONTROLLED 2DDATUM / GD&T
03MATERIALCONDITION / FINISH
04QUANTITYBATCH / ANNUAL
05END USEUSER / DESTINATION